ATYS M6S PDF

The new ATyS M modular changeover system has been designed, tested and proven according to the criteria in the international standard IEC and. The researched Product is not longer available. If you have any questions, please contact your personal consultant. AtyS M6s change-over switch 63A 4P. ATyS M 3s. INSTRUCTIONS SHEET. Automatic Transfer Switch. Ref.: – – – – ATyS M 6s /V Ref.

Author: Moll Bragul
Country: El Salvador
Language: English (Spanish)
Genre: Politics
Published (Last): 9 May 2018
Pages: 274
PDF File Size: 4.40 Mb
ePub File Size: 14.90 Mb
ISBN: 654-8-45649-421-8
Downloads: 81384
Price: Free* [*Free Regsitration Required]
Uploader: Medal

The switch can be forced into OFF emergency stop by inhibiting automatic operation and then remotely ordering the switch into position 0. When it is a single-phase network with neutral 1BLit is necessary to connect terminal neutral to terminal Under what conditions is the autotransformer required?

The locking position is configured by opening up cutting out the required slot, m6e enabling the choice of locking position. How can we define a regulation? What is the tightening torque to be applied to the ‘upstream’ connection, the connection towards the bases and the mounting screws of the fuse of a A SIDERMAT combination switch?

AtysM3s, 2(4), 2/4pole,40A/V – ElectroSource

The harmonics of rank 3 add up on the neutral, and the fundamentals compensate themselves on the neutral. A Vital Part of the. A customer owns a cabinet which is 8 mm stys. The Socomec or China brand ATS is all 4 poles switches and a combination of two load-break switches mounted back to back electrically and mechanically interlocked.

  ANTICYBERSQUATTING CONSUMER PROTECTION ACT PDF

Dieses Leistungsniveau beruht auf folgenden Technologien: For bars 50x3x1 to 80x10x1 apply a coefficient of 1,65 for 2 parallel bars and a coefficient of 2,12 for three bars in parallel.

Delta Transportation Automation Solution www.

Non Critical 10 Technical information. Reference For enclosure height mm: These controllers have USB port to connect to computer for easier operation and monitoring.

Chover,AtysM3s, 1323 2(4)004, 2/4pole,40A/690V

Why the voltages and the currents are positive but the electric power are negative? With regards to space, how many modules are required in order to integrate an ATyS C30 controller into a modular panel?

The Watts losses are the following: Aspiration mode or extraction mode? The password are for device configuration, for software configuration, for administration and 0 on demo mode. Perfectly integrated More information. Service Technologies and Industrial Solutions 3. To consider a source as available, each ATyS checks different criteria: Breaker, Contactor or Motorised Switch Socomec diagram: Product marking which clearly states the position of the device.

ztys

While closing the door back onto the extension shaft, the handle became damaged. Do a Wiring test press the main button for 3s and check the error number to know which wiring error has been made see instruction sheet to know the detailed correspondence.

What association we must do in order to have the alarms information on the page? Devices communicate through the modbus function 3. Global power and thermal solution provider for. The electric mechanism is a single operator momentarily energized. Wie steht es um die Sicherheit der Anlage?

  AMITABH KUNDU COMMITTEE REPORT PDF

Please cite this chapter. What is the standard that governs the fully visualised breaking labeling, position of handle How to wire a motor starter Number: Dataloggers and wireless communication interfaces. The voltage sensing is always upstream of the ATyS, directly on the sources.

Sitemap Glossar Impressum Cookies. Avoid talking to IT since this is not More information. What products are compatible with Vertelis Vision? The ATyS C30 is mm wide, which equals 6. Moreover, even if there is no financial transaction, a MID certified meter is always a better proof than a standard meter.

Global triple-play criptions will reach million by ; up by nearly million on the end total and up by million on the total, according More information. Blitzschlag, Arbeiten an Teilen, die unter Spannung stehen oder starke Beanspruchung des Stromnetzes usw.

For a phase-to-phase voltage between V and V. We guarantee a minimum time of 20ms between the auxiliary contact operation and the switch contact operation.

One word is composed by 2 bytes, with the most significant byte MSB at left. The S type handle enables the deafeat of door interlocking in positions 1 and 2.